Tender

Invitation To Tender – Village Green Play Area Safety Surfacing

Invitation To Tender – Village Green Play Area Safety Surfacing 800 800 Georgina Morgan-Denn

The Council is currently seeking to appoint an experienced and qualified contractor to reinstall the safety surface at the Village Green Play Area. The play area has one area of play bark loose fill surface. The existing bark loose fill surface area is being removed and a new rubber wet pour surface to be laid. The colour and design of the safety surfacing is a chance for the contractor to be innovative which complements the natural surroundings.

Bids need to be received by Monday 9th January 2023.

 

Date ITT advertised Date Issued – 28th November 2022
Date/time ITT clarification questions should be received by email to the Haydon Wick Parish Council Authorised Officer as identified in 1.6 above  

Time: 12:00

 

Date: 12th December 2022

 

Date/time completed ITT response to be received by post and email to the Haydon Wick Parish Council Authorised Officer as identified in 1.6 above  

Time: 10.00

Date: 9th January 2023

Tender evaluation 12th – 13th January 2023
Clarification meetings with suppliers, if required 18th – 19th January 2023
Estimated Contract Award Date 25th January 2023
Place Order 8th February 2023
Project Start Date (Subject to weather conditions) 1st March 2023 To allow for invoicing before April 2023

 

To visit the official contracts finder website, click here.

To view the Tender Document, click here.

 

Clarification Questions & Answers

 

Q1) What is the Area Size? 165m2

Q2) Depths you would want to go to? Minimum of 50mm other depths to be in line with free fall heights.

Q3) Colours of the wet pour surface? As a minimum Black with colour fleck.

Q4) What edges is there to the area to be surfaced? Currently heavy-duty roadside kerbs, we would expect these to be removed and replaced with pin kerbs.

Q5) What is the access to the site? Vehicle access is restricted to public footpaths, works vehicles would require to be parked on grass areas. Due to the proposed contract time frame protection of the grass would be required and any damage caused to be re-instated by the contractor.

Invitations to Tender: Resurfacing of Voyager Drive Play Area

Invitations to Tender: Resurfacing of Voyager Drive Play Area 1900 1200 Caroline Hunt

Haydon Wick Parish Council has an Invitation to Tender (ITT) currently available for bid submissions. The ITT is for the resurfacing of Voyager Drive Play Area. Please click on the links below for more details and documents to download. If you require these documents in another format or if you have any queries, please contact: clerk@haydonwick.gov.uk 

Invitation to Tender: Resurfacing of Voyager Drive 

 

 

Clarification Q&A published – Invitations to Tender – Refurbishment of Play Areas

Clarification Q&A published – Invitations to Tender – Refurbishment of Play Areas 1900 1200 Caroline Hunt

Clarification Questions (updated 18.06.2021):

What material would be preferable with in the design of the park?
Steel is preferred which is more durable and vandal proof. Timber would be considered in the right design but steel is preferred.

What colour wetpour would you like along the edge that is being repaired in Luna play area?
Any thing that you feel that fits in with the park. This is a chance for the supplier to be innovative, such as mixing colours or graphics along the edge.

Any possibility of an extension to the deadlines, with a view to the project date being mid-October?
Unfortunately, the Council cannot extend the deadlines for this tender and would encourage the project start date to be as described on the tender or as soon as practicably possible afterwards if the bid is successful and there is valid reasons as to why the preferred date is not achievable.

The ITT gives a project start date of 23rd August, many lead times are currently into September already. Does the Parish Council have a deadline to work to as this an August start date is not achievable for us.
Possibly a September start date but no later, as closest to the project start date is required due to other deadlines and projects we have this year. If there is sound reason for the project date to be delayed slightly then this will be considered during the scrutiny of the tenders.

Do we need to include the cost of an RPII post installation inspection?
Yes please.

It was suggested that the available budget may flex between sites, is this feasible as would only work if the same company won both tenders, or are we to treat each site entirely separately?
If there is budget savings for using the same company for both sites they need to be listed please so again this can be scrutinised and factored in to why it would be a benefit to use yourselves if successful for this tender. We would still like each play area to be different and have an innovative approach.

Point 2.3 of the Gaynor ITT references games on the footpath, I believe from my site visit that this applies to Luna Close and not Gaynor, please confirm.
Apologies, yes the same document was used and amended for each site its possible that the footpath games had not been redacted upon the final draft.

Will you circulate any relevant clarifications via Contracts Finder or email?
The questions/answers are listed on the Parish Council’s website – these questions will also be uploaded.

Would you like the cost of the old equipment to be removed within the bid at Luna Close?
Please price up for the removal of the small unit, tyre swing small shelter and remove the supper Nova in one piece as we like to reuse it elsewhere. The large tumbler swing is staying.

If needed, could we extend wet pour surface into the pathway in Luna to be able to fit the accessible roundabout?
We preferred not to but if needed in your design, then it will have to go all the way round to the other gate so to fit with the rest.

Would you consider rubber mulch in the bark area at Gaynor Close?
Wet pour rubber granules was the idea to follow in from the original surface.  The Council is open to options in the design as long as it fits with surface already there.

What edge would be put between the new surface and the rest of the bark area due to a possible drop?
This is a chance for the contractor to be innovative. Suggestions received of barriers or even a line of sensory play panels. Perhaps the drop could incorporate a rubber mulch slope.

 

Haydon Wick Parish Council has two Invitations to Tender (ITT) currently available for bid submissions. Both ITT’s are for the refurbishment of play areas. Please click on the links below for more details and documents to download. If you require these documents in another format or if you have any queries, please contact: clerk@haydonwick.gov.uk 

Invitation to Tender: Refurbishment of Luna Play Area

Invitation to Tender: Refurbishment of Gaynor Close Play Area

 

Invitations to Tender: refurbishment of play areas

Invitations to Tender: refurbishment of play areas 1900 1200 Caroline Hunt

Haydon Wick Parish Council has two Invitations to Tender (ITT) currently available for bid submissions. Both ITT’s are for the refurbishment of play areas. Please click on the links below for more details and documents to download. If you require these documents in another format or if you have any queries, please contact: clerk@haydonwick.gov.uk 

Invitation to Tender: Refurbishment of Luna Play Area

Invitation to Tender: Refurbishment of Gaynor Close Play Area

Clarification Questions (updated 18.06.2021):

What material would be preferable with in the design of the park?
Steel is preferred which is more durable and vandal proof. Timber would be considered in the right design but steel is preferred.

What colour wetpour would you like along the edge that is being repaired in Luna play area?
Any thing that you feel that fits in with the park. This is a chance for the supplier to be innovative, such as mixing colours or graphics along the edge.

Any possibility of an extension to the deadlines, with a view to the project date being mid-October?
Unfortunately, the Council cannot extend the deadlines for this tender and would encourage the project start date to be as described on the tender or as soon as practicably possible afterwards if the bid is successful and there is valid reasons as to why the preferred date is not achievable.

The ITT gives a project start date of 23rd August, many lead times are currently into September already. Does the Parish Council have a deadline to work to as this an August start date is not achievable for us.
Possibly a September start date but no later, as closest to the project start date is required due to other deadlines and projects we have this year. If there is sound reason for the project date to be delayed slightly then this will be considered during the scrutiny of the tenders.

Do we need to include the cost of an RPII post installation inspection?
Yes please.

It was suggested that the available budget may flex between sites, is this feasible as would only work if the same company won both tenders, or are we to treat each site entirely separately?
If there is budget savings for using the same company for both sites they need to be listed please so again this can be scrutinised and factored in to why it would be a benefit to use yourselves if successful for this tender. We would still like each play area to be different and have an innovative approach.

Point 2.3 of the Gaynor ITT references games on the footpath, I believe from my site visit that this applies to Luna Close and not Gaynor, please confirm.
Apologies, yes the same document was used and amended for each site its possible that the footpath games had not been redacted upon the final draft.

Will you circulate any relevant clarifications via Contracts Finder or email?
The questions/answers are listed on the Parish Council’s website – these questions will also be uploaded.

Would you like the cost of the old equipment to be removed within the bid at Luna Close?
Please price up for the removal of the small unit, tyre swing small shelter and remove the supper Nova in one piece as we like to reuse it elsewhere. The large tumbler swing is staying.

If needed, could we extend wet pour surface into the pathway in Luna to be able to fit the accessible roundabout?
We preferred not to but if needed in your design, then it will have to go all the way round to the other gate so to fit with the rest.

Would you consider rubber mulch in the bark area at Gaynor Close?
Wet pour rubber granules was the idea to follow in from the original surface.  The Council is open to options in the design as long as it fits with surface already there.

What edge would be put between the new surface and the rest of the bark area due to a possible drop?
This is a chance for the contractor to be innovative. Suggestions received of barriers or even a line of sensory play panels. Perhaps the drop could incorporate a rubber mulch slope.

Explore our latest news